Well the fiddle yard is now finished at the construction level and scenic construction has started. I have been using Hydrofibre. a Belgian landscaping medium to create the cliff faces and landscape and have to say I am quite pleased with the results. The road at the back has been completed and the flocking completed.
Unfortunately work has been delayed owing to having to do routine maintainence on St. Lauren followed by a trip to Potter Heigham in deepest Norfolk with it last weekend.
The next stage is to sort the track out, a mixture of Fleischmann an Peco, and to trial my own strange design for uncoupling Fleiscmann profi couplings. More on that when I have perfected it.
Well thats it for now, as it appears winter has arrived I can really get on with it.