Welcome Guest ( Log In | Register )

2 Pages V   1 2 >
Entries on 23-June 10

entry 23 Jun 2010, 17:37
Last weekend, we started planning out the steam shed area. Here are some pics of prrogress so far. We just need the righht points and some wood.
Attached thumbnail(s)
Attached Image
Attached Image
Attached Image


Entries on 18-June 10

 | Category: Planning
entry 18 Jun 2010, 19:35
Hi all, back again.
Not much done recently, but here is a plan for the locaation of the steam sheds etc. It will connected to the top run and may be sightly above it as well. It mmay bbe blocked from view from the mainline by a hill, still enabling thee viaduct
Attached File(s)
Attached File  Shed_plan.bmp ( 1.25MB ) Number of downloads: 46

Entries on 29-March 10

 | Category: Other Stuff
entry 29 Mar 2010, 15:08
This weekend, the top level 'officialy' oppend. Its now connected to the lower level, and fully wired for DCC. There are still a few minor niggles, but they can be sorte out in time.
Heres a vid of the first train

Entries on 27-March 10

 | Category: Construction
entry 27 Mar 2010, 13:11
Both loops have now been completed, and apart from from the odd bit of ballasting, wiring and the conecting line, the top level is done.
clap.gif clap.gif clap.gif dribble.gif dribble.gif lmfao.gif
Attached thumbnail(s)
Attached Image

Attached Image
Attached Image
Attached Image

Attached Image

Attached Image

Entries on 21-March 10

 | Category: Construction
entry 21 Mar 2010, 15:53
Ok some major progress has been made. The station are has more or less been completed, and we are working on getting the top level completed and joined to the lower level. Pics will follow shortly.
And at 18.00 yesterday, the top level was finished. Weyyyyyyyyyy!
Attached thumbnail(s)
Attached Image
Attached Image
Attached Image

Entries on 7-March 10

 | Category: Other Stuff
entry 7 Mar 2010, 16:18

The first train on the upper level!! thumbsup.gif

Entries on 20-February 10

entry 20 Feb 2010, 19:20
Heres the Station track so far.
Attached thumbnail(s)
Attached Image


 | Category: Construction
entry 20 Feb 2010, 16:34
Ok so this afternoon the track in the station is in place. We now have to plan how to fit in the run off to the lower level.

Entries on 8-February 10

 | Category: Construction
entry 8 Feb 2010, 15:34
Ok so this weekend has beeen spent working on the station area, here are the boards so far.
The job for the holiday os to strart on the station track plan and get at least one upper loop completed.
Attached image(s)
Attached Image Attached Image

Entries on 17-January 10

 | Category: Construction
entry 17 Jan 2010, 20:02
Today, have started on the station area track plan. Pics will be on shortly!

Entries on 16-January 10

 | Category: Scenery and Detailing etc
entry 16 Jan 2010, 18:23
Okay, this afternoon has been spent ballasting. Not sure if I've already mentioned this, but we're using gaugemaster ballasted underlay. However, due to the fact this stuff costs £20 a roll, in future we're panning to use Peco plain foam underlay, spray it with glue and stick ballast onto the foam, as its cheaper.
Attached thumbnail(s)
Attached Image
Attached Image

Entries on 11-January 10

 | Category: Construction
entry 11 Jan 2010, 15:22
OK some serious work has started. On the far side of the board, thebase for the station area has been put in placewith tempoary supports, enabling trais to still run. On the near side, the first bits of line have been balasted using Gaugemaste underlay.
Attached thumbnail(s)
Attached Image
Attached Image
Attached Image
Attached Image


Attached Image

Entries on 9-January 10

 | Category: Construction
entry 9 Jan 2010, 13:31
The second half of the upper level has been completed, and it will be opposit the TMD.

Entries on 13-December 09

 | Category: Construction
entry 13 Dec 2009, 17:04
This weekend has been spent starting on the upper level. So far, we have put a bit of wood for the mainline along the far end of the shed, and the start along the near side. The plan is to have a third radius curve on the outside, and second radius inside. Once this tricky bit is sorted, we'll be happy.
Attached thumbnail(s)
Attached Image
Attached Image


Entries on 25-October 09

 | Category: Scenery and Detailing etc
entry 25 Oct 2009, 11:59
Hi all, Does anybody have any ideas about what caused this? question.gif
Thanks.
Attached thumbnail(s)
Attached Image

Attached Image
Attached Image

Entries on 6-September 09

 | Category: Other Stuff
entry 6 Sep 2009, 11:00
I'll be honest- progress is at a standstill at the minute, reasons being form family illness to there being no time. Plus, I am up to my ears in GCSE course work (or soon will be)!!
So to stop you all getting board to death, I thought it was time for me to post some pictures of life on the SGR.
Attached thumbnail(s)
Attached Image
Attached Image
Attached Image

Entries on 7-June 09

 | Category: Scenery and Detailing etc
entry 7 Jun 2009, 09:28
Ok, so while a not a lots happening on the layout at the minute due to the purchase of a new gadget (a radio controlled helicopter), I thought I'd give you some information on the TMD (Traction Maintenence Depot). It is on 3 levels (Kind of), with two 2-road Peco diesel sheds, 2 fueling points and a general storage siding. At the moment, only 1 of the sheds has lights in it, and the fuelling road have a red LED Above the buffer stop, which can be made to flash or not. I am in the progress of completing a loco hoist, made out of Plaststruct parts, old rails and hornby signal ladders! This is some idea of what it'll look like



Attached Image

The other diesel shed has a inspection pit on one side, and i have plans to install another one in the future. This shed also has the rear half missing, after an accident with some Plastiweld!
Here some pictures of the loco gantry i've been working. Its not quite finished, but its getting there!
Attached thumbnail(s)
Attached Image
Attached Image
Attached Image


Entries on 28-May 09

 | Category: Planning
entry 28 May 2009, 19:26
Heres an idea i Have for the far end of the board;



The narrow gauge starts off in the quarries, then comes down throgh the moors and finally to the shore. It then joins up with the standard gauge branch line. In practise it is very much like the Ffestiniog Railway in Wales ( sorry its not very clear, i'm not an expert with Windows Paint!)
Attached thumbnail(s)
Attached Image
Attached Image
Attached Image


Attached Image

Attached image(s)
Attached Image

Entries on 21-May 09

 | Category: Planning
entry 21 May 2009, 19:04
Well, at last we are slowly getting there. All non essential track has been removed, leaving just 1 running track and one more or less completed TMD. Over the nexts few weeks/months, we are planning to start laying out the 'permanent way' with much weekend possesion!! The plan is to in corperate several ideas (town scene, country branch line, narrow gauge etc) in to one board. Wish us luck. Regular updates will be posted on tis blog, well I say regular...!
Please keep updated with this blog, cheers. by the way,if anyone knows how to make a hoist for a scratch-built loco hoist, please PM me with some ideas, thanks a lot. (Edited 27/05/09; its all right, i've got the picture that i need and i know how i'm going to do it. Cheers!!)

Entries on 22-March 09

 | Category: Scenery and Detailing etc
entry 22 Mar 2009, 10:07
When i was little i used to read 'Thomas the Tank Engine' . All the engines had faces instedad of smokebox doors etc. While of school with an illnes this week, i realised that one of my Bachmann starter loco's had a smoke box door missing. What else better to do then replace it with a face. Who said that railways aren't fun!? I have also made 2 faces for D211 that fix on with bluetac. question.gif wacko.gif dribble.gif
Attached thumbnail(s)
Attached Image

2 Pages V   1 2 >  
SMTWTFS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

My Blog Links


0 user(s) viewing
0 guest(s)
0 member(s)
0 anonymous member(s)

My Picture

Search My Blog