Well the 6G layout was brought out of hibernation on Friday last, into the sunshine for some more work and to have a bit of a running session
There's a lot yet to do and another board to build but the natural light I think shows the whole thing in a better light
I've got to mearge the ballasting and there are some major restructuring work to be done on the scenary.
I've also decided to do away with the open leverframe and utilize the wonderful 'Churchward' LNWR type 4 signal box in its place.
I haven't masrtered the art of posting pictures on here but if you go to my website and chose the "6G" layout page and scroll down you will see the pictures taken on Friday.
http://www.railtimez.co.uk
Nice to actually 'PLAY TRAINS for a change too!!!!!!!
Chris

There's a lot yet to do and another board to build but the natural light I think shows the whole thing in a better light

I've got to mearge the ballasting and there are some major restructuring work to be done on the scenary.
I've also decided to do away with the open leverframe and utilize the wonderful 'Churchward' LNWR type 4 signal box in its place.
I haven't masrtered the art of posting pictures on here but if you go to my website and chose the "6G" layout page and scroll down you will see the pictures taken on Friday.
http://www.railtimez.co.uk
Nice to actually 'PLAY TRAINS for a change too!!!!!!!




Chris


