Model Railway Forum banner
1 - 1 of 1 Posts

·
DT
Joined
·
4,794 Posts
I quite like the idea of manual point control with little levers connected using push-rods to the points. It would work on a simple layout that you describe.

There are ways of doing this: pushrods, wire running through metal or plastic tubes or just a series of levers under the base.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top