Hi Sigma,
You haven't said how big the layout is, but I'm assuming it's not huge. There is another option you may wish to consider, and I am not saying you shouldn't use point motors, which is the wire in tube method. I have used this succesfully in the past where all points are close together and near the operating position. I wouldn't recommend it for a run of more than 18" or so.
Hope this helps.
Regards
John
You haven't said how big the layout is, but I'm assuming it's not huge. There is another option you may wish to consider, and I am not saying you shouldn't use point motors, which is the wire in tube method. I have used this succesfully in the past where all points are close together and near the operating position. I wouldn't recommend it for a run of more than 18" or so.
Hope this helps.
Regards
John