Model Railway Forum banner

Coach couplings

1727 Views 3 Replies 4 Participants Last post by  7113
Hi I am having a problem with my coach couplings. I have been building this layout as I have now retired. The coaches in my stock are all rtr airfix, mainline, bachmann, and hornby all collected over the last 30 years. Most of the coaches were derailing. A check was made of the track by myself and a pro track layer - no problems. A check was made of the couplings all seemed okay. So I expermented by taking the springs out, ran better but still some derailing, oiled the bogies much betting going forward but still problems when pushing stock whatever speed. Any ideas please
1 - 4 of 4 Posts
Did you check the back to back wheel gauge? Should be 14.4mm.
After checking all the back to backs make sure that the bogies are pivoting correctly & are not fowling anything - BTW - what couplings are you using ?

Welcome to MRF.
QUOTE (spillertrain @ 8 May 2008, 11:43) <{POST_SNAPBACK}>The coaches in my stock are all rtr airfix, mainline, bachmann, and hornby all collected over the last 30 years.

If memory serves me right we are talking about coaches with at least four different couplings. It is possible that the different types are not moving together properly thus causing lateral displacement and resulting in derailment.

Just a thought, but it may help.

Regards
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top