Model Railway Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
342 Posts
I'm not sure if this is true or not but someone did tell me that the cost of reequipping thunderbird locos with the equipment neccessary to run on HS1 was concidered too high in relation to the amount of times the locos would ever be needed and as already mentioned only a complete power failure would stop a train in which case the whole line would close untill this was fixed
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top