Joined
·
10,744 Posts
That looks interesting. I particularly like the point work at the left end of Peebles station.
When I'm deciding whether or not a plan works on paper, I do some "what ifs" with the kind of trains I intend to run. So it's questions like "How does the coal train enter and leave the MPD?". "How do goods train get into the yard from each running line?". "Do goods trains need an avoiding line through the station?". "Do local passenger trains terminate and if so what happens to the loco?"
And so on....
David
When I'm deciding whether or not a plan works on paper, I do some "what ifs" with the kind of trains I intend to run. So it's questions like "How does the coal train enter and leave the MPD?". "How do goods train get into the yard from each running line?". "Do goods trains need an avoiding line through the station?". "Do local passenger trains terminate and if so what happens to the loco?"
And so on....
David