Model Railway Forum banner
1 - 1 of 1 Posts

·
Just another modeller
Joined
·
9,983 Posts
Pragmatically, the minimum is the distance needed so you can fit your drill between them to drill new holes... All material sages, but a "Stiffening strip"can easily be placed under critical track-work as long as the basic structure is solidly built.

Richard
 
1 - 1 of 1 Posts
Top