Joined
·
10,744 Posts
QUOTE once laid, ensure the whole point is absolutely level, at rail top height.
confirmation of this can be done, by passing a fine but big file over the whole point.......if any of the plastic sections have raised thmselves, the file will take the top off...
Good tip
I've not considered doing that before.
David
confirmation of this can be done, by passing a fine but big file over the whole point.......if any of the plastic sections have raised thmselves, the file will take the top off...
Good tip

David