Model Railway Forum banner
1 - 4 of 4 Posts

· Registered
Joined
·
2 Posts
Discussion Starter · #1 ·
Can anyone save me some time working out the distance from outside sleeper edge to outside sleeper edge across a Peco Setrack Second radius curve oval track with 6 Standard Straights ( ST1) inserted between the curves and across a similar oval with one ST1 straight inserted? Hopefully my description makes sense.......Thanks
 
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top