Joined
·
1,686 Posts
The way I lay curves is to use the longest and widest coaches to gauge clearances - if they can pass each other with a reasonable amount of space at the closest point then that's where the track gets pinned down! I lay straight sections using the standard points to set the distance apart (as in a crossover) but spacing between tracks on curves is widened gradually as the curve tightens up.