For many modellers the gauge 1 layout that was a turning point in scenic 10mm modelling was my 'Mardy Colliery' built in the mid 1980s. I had become more and more disillusioned with 0 scale and the rapid commercialisation of the scale and wanted to do something more obscure.
Gauge 1 in those days was principally live steam with a mixture of clockwork and various electrics systems thrown in. The Gauge 1 Model Railway Association had done an incredible job of promoting the scale and rescuing it from obscurity.
I had made a start on modelling the London South Western Railway and my infamous Beattie 2-4-0 (the longest project I ever did) was progressing nicely but the plan for the layout, based on the Swanage branch, was already looking impractical so a rethink was on the cards. As the then chairman of the Sheffield 0 gauge group the other members had allowed me to lay a third outer rail on the test track spaced at 45mm so I could test and run in the locos and rolling stock
What was needed was a highly detailed scenic layout at 10mm to the foot but with small prototypes and lots of operational possibilities so the obvious route to go was industrial modelling. The NCB (National Coal Board) was an obvious choice with its varied fleet of Industrial locos shunting main line wagons. tight curves, steep gradients and a generally run down appearance.
One of the principal requirements was a steep, curved approach to the colliery from the hidden sidings and the requirement to run round to get the wagons into the coal screens. In this way there was no simple run in and run out method of operation, you had to do some serious shunting.
The incline was just guesswork with some test trains proving it would work although there were issues with buffer locking of which more, later.
The very early start of construction with the baseboard design self evident
The track up the incline and along the front was Tenmille flexitrack and points and at the rear Marklin points and set track. This threw up a problem at the first show as the locos sparked badly when they were running on the Marklin track. This was traced to the cast iron driving wheels mismatching electrically with the stainless steel rail. As the next show was looming a rapid relaying of all the Marklin track sorted the problem. The Marklin points, which were also susceptible to ballast getting into the tie bars and jamming them, were replaced with hand laid ones using copperclad sleepers. The points at the front of the layout were powered by Fulgurex switch machines and the rear one by wire in tube working off DPDT heavy duty switches.
The first show with not a lot of scenic detail as yet
Control was DC in those days with 00/H0 ECM Compspeed controllers just about coping though they did get a bit hot pushing the Beuhler powered locos up the hill.
Now the layout was running reliably each baseboard in turn was taken to Jack Burnards for him to work his scenic magic and the control panel refined. All of the buildings were scratchbuilt in Foamboard and figures and road vehicles came from a variety of sources. Meanwhile the show invites were coming in and a core team of operators were put together.
We chose the team name the Mardy Model railway club. Not because the layout was based on Maerdy colliery in South Wales but because of the Yorkshire meaning of Mardy, miserable, complaining and grumpy!
More later
Kev
For many modellers the gauge 1 layout that was a turning point in scenic 10mm modelling was my 'Mardy Colliery' built in the mid 1980s. I had become more and more disillusioned with 0 scale and the rapid commercialisation of the scale and wanted to do something more obscure.
Gauge 1 in those days was principally live steam with a mixture of clockwork and various electrics systems thrown in. The Gauge 1 Model Railway Association had done an incredible job of promoting the scale and rescuing it from obscurity.
I had made a start on modelling the London South Western Railway and my infamous Beattie 2-4-0 (the longest project I ever did) was progressing nicely but the plan for the layout, based on the Swanage branch, was already looking impractical so a rethink was on the cards. As the then chairman of the Sheffield 0 gauge group the other members had allowed me to lay a third outer rail on the test track spaced at 45mm so I could test and run in the locos and rolling stock
What was needed was a highly detailed scenic layout at 10mm to the foot but with small prototypes and lots of operational possibilities so the obvious route to go was industrial modelling. The NCB (National Coal Board) was an obvious choice with its varied fleet of Industrial locos shunting main line wagons. tight curves, steep gradients and a generally run down appearance.
One of the principal requirements was a steep, curved approach to the colliery from the hidden sidings and the requirement to run round to get the wagons into the coal screens. In this way there was no simple run in and run out method of operation, you had to do some serious shunting.

The incline was just guesswork with some test trains proving it would work although there were issues with buffer locking of which more, later.
The very early start of construction with the baseboard design self evident

The track up the incline and along the front was Tenmille flexitrack and points and at the rear Marklin points and set track. This threw up a problem at the first show as the locos sparked badly when they were running on the Marklin track. This was traced to the cast iron driving wheels mismatching electrically with the stainless steel rail. As the next show was looming a rapid relaying of all the Marklin track sorted the problem. The Marklin points, which were also susceptible to ballast getting into the tie bars and jamming them, were replaced with hand laid ones using copperclad sleepers. The points at the front of the layout were powered by Fulgurex switch machines and the rear one by wire in tube working off DPDT heavy duty switches.
The first show with not a lot of scenic detail as yet

Control was DC in those days with 00/H0 ECM Compspeed controllers just about coping though they did get a bit hot pushing the Beuhler powered locos up the hill.
Now the layout was running reliably each baseboard in turn was taken to Jack Burnards for him to work his scenic magic and the control panel refined. All of the buildings were scratchbuilt in Foamboard and figures and road vehicles came from a variety of sources. Meanwhile the show invites were coming in and a core team of operators were put together.

We chose the team name the Mardy Model railway club. Not because the layout was based on Maerdy colliery in South Wales but because of the Yorkshire meaning of Mardy, miserable, complaining and grumpy!
More later
Kev