Hi Dave. You're right it's DC, can't be doing with the cost of DCC. All points are electrofrog and I used the wiring diagrams supplied by PECO on the Single Slip & the 3-way that is installed immediately after the slip. There are 2 isolating sections, one on the platform road, the other on the loop, to allow shunting without closing the level crossing to road traffic.
Thanks for your comments. Always good to get other people's opinions