Model Railway Forum banner
1 - 2 of 2 Posts

·
No Longer Active.
Joined
·
13,319 Posts
Hi - I've found in the past that liquid poly's are not too good when using Peco flexy track - it may have something to do with the actual plastic they use.

Generally, I've found PVA left overnight is usually OK.

With paving between track I've found that its better to have the rail heads slightly proud of the paving.

Hope this helps.
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top