I am just about to lay down a layout of Peco Setrack Insulfrog Code 100.
I have some confusion with regard to the wiring, do I need to feed at each toe and isolate the two lines coming from that and then feed those two lines after the isolation break.
Or if I read the Peco catalogue correctly, the Insulfrog does this all for me and I only need to feed the track at regular intervals.
Some guidance would be very much appreciated