Hi Simon
Sorry to be late with a reply to your question, you've maybe worked it out already but, if not, then the easiest way I found was to insulate all eight rail ends and provide a power bus link to the two outside rails - let the point blades do their job. Works a treat for me.
Mike.
Sorry to be late with a reply to your question, you've maybe worked it out already but, if not, then the easiest way I found was to insulate all eight rail ends and provide a power bus link to the two outside rails - let the point blades do their job. Works a treat for me.