It's a mind-numbing process. I wrote elsewhere that I was looking at Fremo modules. As someone with ADD, it can be difficult to stay focused on one large task. I have some project management experience and luckily that included Agile PM methodology. If I go down the modular path, at least i can create and finish each module in smaller manageable chunks. Assuming that I ever start, that is.

My temporary 1500x2700 table is Ok, but when pushed up against the wall, derailments etc are challenging to resolve, so the width issue is real.

The only permanent layout solution that I have toyed with is a purpose built 1.5x 6.5 shed (over 10sqm = council meddling) with 2 or 3 levels.
Luckily, 3R allows for easy return loops; track visual details isn't a high priority here.
 