QUOTE (Doug @ 26 Jul 2007, 19:44) <{POST_SNAPBACK}>I am also planning on using shunters to move coaches up to the mainline from the yards below. A pair of Class 20 locos in a consist will haul up any train up my 1:40 ramp. They will then pass on the rolling stock to the mainline engines that went up by themselves or with a lighter load.
I'd never thought of that! Far more positive than telling someone they're screwed!
Seriously I usually recommend 1:50 minimum but like most things all situations are unique and though not relevant to Mike's situation even consider two separate levels rather than use inclines.
I'd never thought of that! Far more positive than telling someone they're screwed!

Seriously I usually recommend 1:50 minimum but like most things all situations are unique and though not relevant to Mike's situation even consider two separate levels rather than use inclines.