Model Railway Forum banner
1 - 2 of 2 Posts

·
Registered
Joined
·
461 Posts
Discussion Starter · #3 ·
Yes the pits have been sunk into the base board, as for the 3 way point I haven't been told anything special about the wiring.

I have to fix the track down this will be done by painting the cork with pva and then placing the track on it (while wet) and then ballasting it but before that I will get to the same level on the second base board.

Pete
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top