Discussion Starter · #1 ·
just putting ideas together about what i can do. haven't decided where my track is to go nether the layout.
started making buildings, walls etc out of plaster (i feel it is more hard wearing than card), which I'm improving on slowly.

as you can see from the pic's a long way to go.
 

·
Registered
Joined
·
189 Posts
Looking good for a start. Start getting the baseboards together and get some pencil and paper out. For me I decided to start with a make up layout (anything you want. like a bit of mountainous passes, lowland raised railway and urban centre all within a stones er. bounce.

Or like a few very successful looking layouts, based on an actual shunting yard or railway station .

Anything is possible.

My layout is homeless while I fix up the attic and the rest of the house.

Enjoy

Basil Mc Herb
 

·
Administrator
Joined
·
9,844 Posts
I'd be tempted to add some passing loops in the hidden mountain section at the top so that I could have somewhere to store trains and add an element of surprise in operation.

David
 

·
Premium Member
Joined
·
4,854 Posts
QUOTE (Matt1984 @ 28 Jan 2008, 20:25) <{POST_SNAPBACK}>Yes it is Linka, i find it's easy to use.

if you interested in some:

http://mysite.orange.co.uk/modellandscape

Hi Matt,

Just a little tip on using Linka. I mix some powder paints (brown, black & yellow) in with the plaster ( I actually use Artex powder) which produces a 'stone' colour. You can get brick colouring using red, yellow, brown & black. You will need to do some mix trials to get the colour/shade you want but don't overdo the powder paint as it does tend to weaken the plaster.

Also if you do not completely mix in the powder paint you can get 'streaks' and 'blobs' of colour which give a more natural and varied effect.

The advantage of this is that if, at some future date, the structure is slightly damaged, you do not get a glaring piece of white plaster showing up. I also weather my Linka structures by dry-brushing very small amounts of powder paint onto the finished building before spraying the whole thing with a matt varnish.

I would be interested to know the size/ gauge of your layout as some of those gradients look as though they might be quite steep.

Keep up the good work

Expat
 

·
Registered
Joined
·
29 Posts
Discussion Starter · #10 ·
QUOTE (Expat @ 1 Feb 2008, 05:21) <{POST_SNAPBACK}>Hi Matt,

Just a little tip on using Linka. I mix some powder paints (brown, black & yellow) in with the plaster ( I actually use Artex powder) which produces a 'stone' colour. You can get brick colouring using red, yellow, brown & black. You will need to do some mix trials to get the colour/shade you want but don't overdo the powder paint as it does tend to weaken the plaster.

Also if you do not completely mix in the powder paint you can get 'streaks' and 'blobs' of colour which give a more natural and varied effect.

The advantage of this is that if, at some future date, the structure is slightly damaged, you do not get a glaring piece of white plaster showing up. I also weather my Linka structures by dry-brushing very small amounts of powder paint onto the finished building before spraying the whole thing with a matt varnish.

I would be interested to know the size/ gauge of your layout as some of those gradients look as though they might be quite steep.

Keep up the good work

Expat

Yes, i have started this method and it's coming on well.

the gauge is OO, where are you looking at? perhaps it's not clear on the layout.
 

·
Premium Member
Joined
·
4,854 Posts
QUOTE (Matt1984 @ 1 Feb 2008, 20:59) <{POST_SNAPBACK}>Yes, i have started this method and it's coming on well.

the gauge is OO, where are you looking at? perhaps it's not clear on the layout.

Hi Matt,

I'm looking at the distance between the station at the bottom of the diagram and the point where the two tracks cross over each other. If the drawing is to scale I would guess this distance is about 4 ft or maybe 6 ft at maximum which would make the gradient somwhere between 1 in 20 and 1 in 25 which is very steep and would certainly limit the number of coaches/wagons that could be pulled up it.

I think the normally recommended maximum grade is 1 in 36 but personally I try not to go any steeper than 1 in 50. The grades on my current layout are max 1 in 58 and min 1 in 84.

Regards,

Expat.
 

·
Registered
Joined
·
29 Posts
Discussion Starter · #12 ·
QUOTE (Expat @ 1 Feb 2008, 18:51) <{POST_SNAPBACK}>Hi Matt,

I'm looking at the distance between the station at the bottom of the diagram and the point where the two tracks cross over each other. If the drawing is to scale I would guess this distance is about 4 ft or maybe 6 ft at maximum which would make the gradient somwhere between 1 in 20 and 1 in 25 which is very steep and would certainly limit the number of coaches/wagons that could be pulled up it.

I think the normally recommended maximum grade is 1 in 36 but personally I try not to go any steeper than 1 in 50. The grades on my current layout are max 1 in 58 and min 1 in 84.

Regards,

Expat.

oh, i see. I have tried this layout but as you say i didn't have many coaches. Thank you for the advice.
 

·
Registered
Joined
·
63 Posts
Hi Matt,
Welcome and I hope you are enjoying your new hobby.
But I have to say that is one hell of a hammer you are using to put track pins in with!
Duztee.
 

·
Registered
Joined
·
29 Posts
Discussion Starter · #15 ·
QUOTE (Duztee @ 6 Feb 2008, 10:05) <{POST_SNAPBACK}>Hi Matt,
Welcome and I hope you are enjoying your new hobby.
But I have to say that is one hell of a hammer you are using to put track pins in with!
Duztee.

LOL
 

·
Registered
Joined
·
29 Posts
Discussion Starter · #17 ·
QUOTE (qweasdzxc @ 21 Feb 2008, 20:29) <{POST_SNAPBACK}>Thats a really good track plan
post photos when your done

oh thanks, i have added another track in the mountain side too.

yeah i'll have to get some more pic's. only doing a bit a week, slowly does it.
 

·
Premium Member
Joined
·
4,854 Posts
Hi Matt,

I've been thinking some more about those gradients and I see that you are working on a flat baseboard and have already laid some track. It occurs to me, however, that if you raise the level of the station by 25mm or so and then take the line going towards the hidden mountain section on a downward grade you will be able to shallow out the grade which rises towards your mountain station. This would also fit well with the spur line going into the mine which could follow the same downward grade. That way you would only need to raise the upper line by 35mm or so from the station to the point where it crosses over the lower line which would, at a guess, give you a more acceptable gradient of about 1 in 35.

I realise you have already laid some track but you might like to give this some thought before you progress too far. I bit of time spent taking a backward step now will certainly pay dividends and improve the operational quality of the finished layout.

Regards,

Expat.
 

·
Registered
Joined
·
189 Posts
QUOTE (Matt1984 @ 8 Feb 2008, 18:15) <{POST_SNAPBACK}>LOL

Looks like you actually have a designated space for your layout. Mine is currently in a few boxes (it is a sizable layout) and my engines are in a tool drawer on track so it acts like a workshop. (i.e I,m fixing up the attic for guests - damn them)

I also like to hammer for the track pins and it must be fun fixing on the track with maybe a few sore thumbs etc.

Welcome to an excellent hobby and the ability to make any layout you wish. I would take the advice above and keep the gradiens light. and the advice of sticking to 1:33 would seem sensible. Any more and you will limit the operation. I would like to achieve steeper gradients but it depends on the loco being used.

Enjoy

Basil
 

·
Registered
Joined
·
29 Posts
Discussion Starter · #20 ·
QUOTE (Basil @ 23 Feb 2008, 08:52) <{POST_SNAPBACK}>
Looks like you actually have a designated space for your layout. Mine is currently in a few boxes (it is a sizable layout) and my engines are in a tool drawer on track so it acts like a workshop. (i.e I,m fixing up the attic for guests - damn them)

I also like to hammer for the track pins and it must be fun fixing on the track with maybe a few sore thumbs etc.

Welcome to an excellent hobby and the ability to make any layout you wish. I would take the advice above and keep the gradiens light. and the advice of sticking to 1:33 would seem sensible. Any more and you will limit the operation. I would like to achieve steeper gradients but it depends on the loco being used.

Enjoy

Basil

i have changed the track slightly, i will post pics today and my progress on the track.
the tracks no longer cross over up to the mountain side.