Model Railway Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
1,144 Posts
The old 2P that you have dates from the 1970s and was developed from the L1 moulding. The model makemineadouble is referring to is the former Mainline/Dapol one that Hornby acquired the tooling of in the mid 1990s.
 
1 - 1 of 1 Posts
Top