Model Railway Forum banner
Status
Not open for further replies.
1 - 4 of 4 Posts

·
garage hobbit!!!
Joined
·
1,715 Posts
Thats a nice plan Ray

I think with a little altering it can be made into a continues run, my thinking is, if you remove the station on the bottom part of the plan, then have the tracks curve round under the raised area and connect to the lines that come down from the raised lines in the hidden section, then you could have the continues run and the mainline terminus, any trains wanting to return to the raised terminus would do so from the station at the top of the plan, you could turn the area where the remove station is into some industrial sides, I would then remove the TT from the bottom left, again would leave more room for scenery

hth
 

·
garage hobbit!!!
Joined
·
1,715 Posts
making a great progress on them Ray

enjoy your holiday, please take your camera and share lots of pics of the IoW Steam Railway with us on your return please
 

·
garage hobbit!!!
Joined
·
1,715 Posts
Looking good Ray

I agree with Brian on the tape, its what I us, can be easilly removed if the plan changes too

if you dont find those ptm buttons, drop me a PM and I will dig out my draw, am sure I have loads from my old layout
 

·
garage hobbit!!!
Joined
·
1,715 Posts
Nice job there Ray, should look the part when painted & weathered up
 
1 - 4 of 4 Posts
Status
Not open for further replies.
Top