Model Railway Forum banner
1 - 1 of 1 Posts

·
Paul Hamilton aka "Lancashire Fusilier"
Joined
·
844 Posts
Back to scale time again - I belief that the adaption of a fast clock with ajustable scaling up of "operations time" is adaptable to the layout you have and if a timetable is to be followed then some form of "time acceleration" will be necessary unless the layout represents a) total fidelity with the prototype with respect to distances and
has significant numbers of movements or operations to keep things interesting. As such there is no one size fits all application as refleected in the posts above.

It would appear from review of the US modelling press that this is an area well matured by the US modelling crew but perhaps less shared amongst the UK outline modellers represented heavily on this and other UK based forums.
 
1 - 1 of 1 Posts
Top