Model Railway Forum banner
1 - 1 of 1 Posts

·
Chief mouser
Joined
·
11,775 Posts
I have to go with the buy new school of thought, this is based on experience, as when we recently rebuilt the storage loops for St Laurent I decided to see how much could be salvaged. The answer was most of the points and about 6 feet of track, some of which has been used where only a short piece of track is required.

Regards
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top