Model Railway Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
11 Posts
Actually 'Shake-the-Box' is covered.

At Upton Magna the headshunt acts as the trap, at Roden ditto and at Walton local regulations dictate that the lever frame is locked set for the platform road with the point leading off the loop to the goods shed/coal siding set in reverse. Alternatively you could put a dummy catch in the end of the loop.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top