Model Railway Forum banner
1 - 1 of 20 Posts

· is asleep
Joined
·
759 Posts
Do try and minimise how many levels the helix has, i.e. by making the storage level as close to the underside of the layout as is comforable for access/pointwork wiring etc. - I've seen several layouts with ridiculous gaps between levels and trains can spend ten minutes going round and round. A waste of time and the less time a train spends going uphill the less wear the drive system will have to endure...besides the driver will get a headache!

Goedel
 
1 - 1 of 20 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top