I am looking at a OO shunting layout.
I am going to use Peco 75 track, and only operate one loco at a time. Its 9' x 2'
I have been looking at the Hornby elink. Are there any pitfalls to using this control with this layout?
Or is there a better way for this shunting layout?

I am going to use Peco 75 track, and only operate one loco at a time. Its 9' x 2'
I have been looking at the Hornby elink. Are there any pitfalls to using this control with this layout?
Or is there a better way for this shunting layout?